Hadapsar, Pune
Devraj Legal ServicesLegal Advisory, Licensing & Consultancy Firm
Book a consultation

Factory Licence and Plan Approval in Maharashtra: A Practical Guide

4 min readUpdated October 2026

A factory licence is required in Maharashtra before you start manufacturing in premises that fall within the legal definition of a factory. For a new building or an expansion, plan approval usually comes first. This guide explains the factory licence and plan approval process for units in Pune and other parts of Maharashtra, and the compliance that continues after you start.

Factory licence, plan approval and the OSH Code

Factories in Maharashtra are regulated by the Directorate of Occupational Safety and Health, Maharashtra State, earlier known as the Directorate of Industrial Safety and Health (DISH). It deals with plan approvals, factory licences, inspections and safety and health compliance.

Factory law was earlier governed by the Factories Act, 1948 and the Maharashtra Factories Rules, 1963. The Occupational Safety, Health and Working Conditions Code, 2020 (OSH Code) has now been brought into force by the Central Government, and Maharashtra has been framing its own rules under it. Forms and procedures can change during this transition, so confirm the current requirement before you apply.

Who needs a factory licence

As per the Central Government's published information on the OSH Code, the worker limit for a factory licence has been raised to 20 workers where power is used and 40 where it is not. You should check your position if you are:

  • Setting up a new manufacturing or processing unit
  • Expanding a building, adding machinery or changing the manufacturing process
  • Increasing the number of workers or power load beyond what your licence allows
  • Taking over an existing factory or changing the occupier or manager
  • Running hazardous processes, where extra approvals and conditions apply

Documents usually required

Applications are made online, and the exact list depends on the type of factory and process. Commonly required:

  • Ownership or lease documents of the premises
  • Site plan, building layout and machinery layout drawings
  • Manufacturing process flow chart and list of raw materials
  • Details of the occupier and manager with ID and address proof
  • Constitution documents of the business, such as partnership deed or incorporation certificate
  • Building stability certificate from a competent person
  • List of machinery and connected power load
  • Other approvals where applicable, such as MPCB consent and fire NOC

Step-by-step factory licence process

  1. Check whether your unit falls within the definition of a factory under the current law.
  2. Prepare building and machinery layout drawings with process details.
  3. Apply online for plan approval before construction or expansion, where required.
  4. Answer any queries raised by the Directorate on the drawings.
  5. Complete construction and machinery installation as per the approved plan.
  6. Apply online for the factory licence with occupier, manager and worker details.
  7. Pay the applicable fee and respond to any scrutiny or inspection.
  8. Receive the licence and display it at the factory.

Ongoing safety and health compliance

  • Renew the licence on time and apply for amendment when workers, power or process change.
  • Maintain the registers and records required for workers, working hours, leave and accidents.
  • File the annual return online by the due date notified by the Directorate.
  • Report accidents and dangerous occurrences to the Directorate as required.
  • Get pressure vessels, lifts and lifting machines examined by competent persons.
  • Arrange medical examinations of workers where the rules require them.
  • Provide safety equipment, drinking water, toilets, first aid and other welfare facilities.
  • Keep records ready for inspection and reply to notices within the time given.

How Devraj Legal Services can help

Devraj Legal Services, based in Hadapsar, Pune, helps factory owners across Maharashtra with factory registration, plan approval, licence renewal and expansion or modification permissions. We give a checklist suited to your process, coordinate with your architect or engineer on drawings, and handle online filing and follow-up with the Directorate.

We also assist with occupier and manager details, labour law and safety compliance, annual returns, inspection preparation, replies to notices and periodic compliance audits of your records. Technical drawings and certificates are prepared by qualified professionals; we keep the file complete and on time.

Frequently asked questions

Is a factory licence needed for a small workshop?

It depends on the number of workers and whether power is used. Under the OSH Code the limit has been raised, so some small workshops may not need a factory licence, but they may still need other registrations.

Is plan approval required before the factory licence?

For new buildings, extensions and many changes in layout or machinery, plan approval is usually needed before construction or installation. The licence is applied for once the factory is ready to start.

Who is the occupier of a factory?

The occupier is the person who has ultimate control over the affairs of the factory, such as the proprietor, a partner or a director nominated by the company. The occupier is responsible for compliance.

Has the Factories Act been replaced?

The OSH Code, 2020 has been brought into force and replaces the Factories Act, 1948 along with several other laws. State rules and procedures are being updated, so check the current forms before filing.

This guide is general information, not legal advice. Rules, forms and fees change and depend on your facts, so confirm current requirements before you act. Where court or tribunal representation is needed, it is handled by independently engaged advocates.

Book a consultation

Let's talk about your matter.

Speak to Adv. Sudarshan Vartale or the team today.